RAYPCB · ENGINEERING GUIDE
Panasonic R-5375 PCB: Halogen-Free MEGTRON 6 Choices
Panasonic R-5375 is the halogen-free MEGTRON 6 material route with distinct E-glass and low-Dk-glass variants. It should not inherit the entire R-5775 property table simply because both products are associated with MEGTRON 6.
This page compares the material and construction decision when chemistry and channel performance both matter. The Panasonic material hub provides the family context; the exact suffix remains part of the released specification.

Identify E and N before comparing data
The manufacturer technical sheet identifies R-5375(E) and R-5375(N), with corresponding R-5370 bonding materials. It distinguishes their reinforcement and dielectric characterization. Do not combine the E variant's mechanical context with the N variant's electrical value into an invented optimum grade.
Different Panasonic documents report characterization at different frequencies. Preserve the selected sheet's method, sample and revision. A change from a rounded 12 GHz table to a more detailed 13 GHz table is not evidence of a manufacturing improvement by itself.
Construction decisions at a glance
| Review focus | Established context | Design boundary |
|---|---|---|
| Variants | E-glass E and low-Dk-glass N | No mixed property column. |
| Chemistry | Exact halogen criterion | Separate from electrical approval. |
| Construction | Complete line and thermal history | Not ordinary R-5775 equivalence. |
Keep halogen-free evidence separate from signal integrity
The chemical declaration and the channel model address different requirements. Ask for the exact product declaration needed by the customer, including the applicable criterion. A low-loss label does not establish chemical compliance, and a chemistry declaration does not qualify the electrical route.
If the original approved drawing uses R-5775(G), a proposal for R-5375(E) is a material change to evaluate. Record the thermal, dimensional and electrical assumptions rather than presenting the new product as a spelling variation.
| Review item | What to establish |
|---|---|
| Variants | R-5375 E/N and R-5370 bonding system |
| Chemistry | Exact declaration and customer criterion |
| Electrical | Matched complete loss, copper and geometry |
| Boundary | No automatic R-5775 equivalence or price |
Matched construction loss and allowance comparison
Matched construction loss and allowance comparison
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Common routing length · inches | Same channel boundary and frequency for both candidates. |
| Candidate A complete loss · dB/in | From comparable measurement or simulation, not Df alone. |
| Candidate B complete loss · dB/in | Use same copper, line geometry assumptions and reference planes. |
| Candidate A quoted unit allowance | User-supplied currency value; no embedded price data. |
| Candidate B quoted unit allowance | Same quantity, scope and currency as A. |
| Currency or allowance unit | Label only; no currency conversion. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a RAYPCB quotation. You can contact the team without completing it.
Optional project allowance comparison
Compare the complete line and the quote scope
The paired worksheet accepts two complete routing-loss rates, a common length and user-entered unit allowances. Use matched frequency, reference planes and geometry. Keep the copper profile and any treatment changes with the model.
An illustrative ten-inch route at 1.0 versus 0.6 dB per inch differs by 4 dB. Those numbers are not grade presets. The commercial comparison is equally conditional: it is meaningful only when board quantity, inspection and qualification scope are comparable.

Examine reinforcement changes explicitly
The R-5775(N) timing guide shows why a low-Dk-glass choice needs more than a single loss number. Changes in dielectric construction can affect geometry and propagation assumptions, while weave placement can remain relevant to sensitive differential routes.
Confirm available glass styles, resin content and core dimensions with the fabricator. A public product list does not guarantee that every proposed thin core or pressed interval is available for the planned quantity and production schedule.
Review the multilayer process boundary
High layer count and sequential construction expose the material to a process history that differs from a simple two-layer board. Identify the deepest holes, relevant copper distribution and representative verification locations. Thermal characterization alone does not approve the full construction.
For thin mobile HDI, the R-A 555W guide addresses a separate geometry and material task. Do not apply a processing example from that family as a universal cure or drilling instruction for R-5375.
Freeze the change decision before ordering
Send the original and proposed stackups, exact suffixes, chemistry requirement, channel allocation and assembly history. Include quantity, board size, copper and the requested test evidence. Ask the supplier to identify deviations from the analyzed construction.
The useful deliverable is a documented choice and a comparable quote, with unresolved supply or qualification questions still visible. Calculator outputs can accompany the inquiry manually, but they do not authenticate the source or authorize a substitution.
Tie the exact grade to an electrical construction
State the channel reference planes, frequency range, routing length, copper construction, transitions and interface assumptions together. A laminate loss-tangent value is one input to that system. It is not a complete insertion-loss measurement or a guarantee that a data rate will work.
Use comparable measurement or modeling conditions when screening alternatives. Material changes can require geometry changes to preserve impedance, and copper roughness can alter the result independently of the resin system. Keep the proposed stackup and the channel analysis synchronized through fabrication review.
For procurement, identify the properties that are fixed and the alternatives that can be evaluated. Request evidence at the relevant construction and frequency rather than a broad low-loss label. Compare total delivered scope and validation effort alongside material price. A shorter or better-routed channel may change the tradeoff more than replacing a material name alone.
A useful design-data record retains both the material value and the reason it was selected. State whether the value is supplier characterization, a construction-specific design input, a measured coupon extraction or an early assumption. These sources are not interchangeable. Keep frequency, method and specimen information visible when a comparison uses more than one document.
The tool on this page starts empty because a plausible default can otherwise be mistaken for a verified grade profile. Use the example to understand the units, then replace it with project inputs. A result with many decimal places does not imply that the material or routing-loss input is known to that precision.
For a high-speed design, plan how the model will be checked. Reference planes, coupon geometry, fixtures and the acceptance boundary determine what a measurement means. A coupon that characterizes one line construction does not automatically qualify every route or transition on the board.
Keep the commercial comparison aligned with the engineering one. Quantity, copper, layer structure, test deliverables and qualification effort should be comparable. A lower material allowance can be irrelevant if the proposed construction cannot meet the channel requirement, while a premium grade may be unnecessary if the actual route already has sufficient validated margin.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not RAYPCB production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.