ELECTRONICS NPI CHECKLIST: FROM DESIGN RELEASE TO PILOT BUILD RAYPCB engineering preparation worksheet https://www.raypcb.com/resources/electronics-npi-checklist/ Version 2026.09.16-linked-resources-r1 Project / customer: ____________________ PCB / assembly part number: ____________________ Document revision: ____________________ Prepared by / date: ____________________ Quantity / intended application: ____________________ Use this as an editable preparation checklist. It is not a manufacturing release, supplier certificate, inspection report or quote. REVIEW ITEMS 1. Product revision manifest and released requirements Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 2. Fabrication files, BOM, placement and assembly drawings Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 3. Approved sourcing and variant/DNF decisions Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 4. DFM/DFA issues and written closure Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 5. Firmware, fixture and test-procedure readiness Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 6. Pilot inspection/test evidence and issue log Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 7. Corrective actions with owners and deadlines Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 8. Acceptance and traceability requirements Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 9. Authorized production release and future change-control owner Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ APPROVAL AND HANDOFF Open items and permitted exceptions: ____________________ Agreed next action and responsible owner: ____________________ Released file manifest / approval reference: ____________________ Send only the appropriate project information through the Contact page. This worksheet does not upload files or transfer parameters automatically.