PCB Assembly FAQ
120 answers—from your first quotation to the next production release.
Find practical answers about files, component sourcing, assembly, sample approval, testing and shipment. Use the topic links or search for a specific issue. General engineering guidance is separate from project-specific price, capability and commercial terms, which need written confirmation with your order.

Find the answer for your project
PCB Assembly FAQ Search
Search runs only in this page. No files are uploaded and no question is sent by using the search. Without JavaScript, use the topic links and open the questions below.
Quoting, cost & order scope
For a cost breakdown, see the factors that change PCB assembly cost. Separate setup, component sourcing, placement, inspection and fixtures before comparing quotations.
1. What should I send for a PCB assembly quote?
Send the board files, BOM, assembly quantity, placement data and drawings where available. Include required delivery date, supply responsibilities and test requirements. Identify preliminary information so the quote can state its assumptions.
Link to this answer2. Can I request a quote before the design is finished?
Yes, you can ask for a preliminary review with the information available. Identify missing files and unsettled parts. A planning estimate should be revised against the released design before purchasing or production is authorized.
Link to this answer3. What is included in a turnkey assembly quotation?
Ask for the scope to identify bare-board fabrication, component procurement, setup, assembly, inspection and testing separately. Freight, taxes, fixtures, coating and enclosure work should not be assumed included unless listed.
Link to this answer4. Why is the price per board higher for a small batch?
Setup, stencil and preparation costs are spread over fewer units. Component minimum purchases and test fixtures can also matter. Compare total spending and leftover inventory, not only the assembly labor line.
Link to this answer5. What is the minimum order quantity?
Request review of the actual quantity and design. Assembly minimums and component purchase minimums are different questions. No universal minimum applies to every technology, component package or material combination on this page.
Link to this answer6. Can I compare several quantities in one enquiry?
List the quantities and whether they are alternatives, separate releases or different designs. Ask which setup, material and fixture assumptions change between them. An annual forecast should be distinguished from a committed purchase.
Link to this answer7. Is an online estimate a firm quotation?
No. A calculator cannot fully confirm component availability, design complexity or test preparation. Use it for planning, then submit the files for a quotation with defined inclusions, exclusions, validity and delivery assumptions.
Link to this answer8. Which costs may be non-recurring?
Stencil manufacture, initial programming preparation and dedicated test fixtures may be non-recurring within an agreed scope. Setup can repeat with each lot. Ask about reuse conditions, ownership and charges following a revision.
Link to this answer9. Does a quote remain valid if the BOM changes?
A BOM change may affect availability, setup, inspection and price. Identify the changed lines and request a revised quotation or written confirmation before relying on the previous price and schedule.
Link to this answer10. Can I change or cancel an order after approval?
Request an immediate status review. Purchased components, completed fabrication and work already performed can affect the available options and charges. Cancellation, payment and refund terms must follow the accepted commercial agreement.
Link to this answerPCB files, drawings & revision control

11. Which manufacturing files does assembly need?
Provide the agreed PCB fabrication data, BOM, pick-and-place file and assembly drawings. Add special instructions and test requirements. Confirm accepted formats for the job; a design screenshot is not a manufacturing data package.
Link to this answer12. Are Gerber files enough for component assembly?
Gerbers describe board artwork but do not reliably communicate all component identities, orientations or fitted variants. Include a BOM and placement data, supported by assembly drawings and any special instructions.
Link to this answer13. What belongs in a pick-and-place file?
Include reference designators, component positions, rotation, board side and coordinate units. State the origin and ensure the file matches the released board revision. CAD rotation conventions may require review rather than blind import.
Export the intended fitted variant and check the generated file against the drawing, including one known component on each populated side. The pick-and-place file guide and local checker help review units, origin, side and rotation; a structural check cannot approve component orientation.
Link to this answer14. Do you need the schematic?
A schematic can help resolve connectivity, orientation and test questions, but it does not replace fabrication and assembly data. Ask whether it is required for your review and use an agreed channel for confidential information.
Link to this answer15. What should an assembly drawing show?
Show reference designators, polarity, orientation, DNP locations and special mounting details. Add connector direction, hardware, adhesive or height requirements where relevant. Use the same revision identification as the rest of the build package.
Link to this answer16. Can I supply native CAD files instead of exports?
Identify the CAD system and version and ask which formats can be reviewed. Also provide controlled fabrication and assembly exports where practical. Conversion must not silently change the released design.
Link to this answer17. How should I identify the current revision?
Use an unambiguous board number and revision across the BOM, drawing, fabrication data and placement file. Include a release manifest. Remove superseded files from the production package or label them clearly as reference only.
Link to this answer18. Can one order contain several assembly variants?
List each variant with its quantity and fitted BOM. Clearly identify shared boards, DNP changes, firmware and labels. Separate variant identity prevents purchasing and assembly instructions from being mixed.
Link to this answer19. What if the placement file disagrees with the drawing?
Flag the conflict for engineering resolution before release. State which corrected files are approved; do not ask an operator to infer the intended orientation from conflicting documents.
Link to this answer20. How can I share files securely?
Ask for the agreed transfer method and any NDA or access requirements before sending sensitive designs. Do not put design files in public links or calculator fields. This FAQ does not establish a security certification or retention policy.
Link to this answerSee the illustrated assembly process · Discuss your requirements
BOM quality & approved alternatives
21. What are the essential BOM fields?
Use manufacturer, complete manufacturer part number, quantity per board and reference designators. Include package and useful description, plus fitted/DNP status and supply owner. Identify approved alternatives separately from the preferred part.
Link to this answer22. Is a distributor stock number sufficient?
Include the manufacturer part number as the primary identity. A distributor number helps sourcing but may refer to a particular packaging or order quantity. Check that the offered manufacturer part and suffix match the design.
Link to this answer23. Why do part-number suffixes matter?
Suffixes can distinguish package, grade, temperature range, finish or packing form. Some differences affect fit or performance. Resolve the meaning from the manufacturer's ordering information instead of truncating a part number.
Link to this answer24. How do I mark DNP components?
Identify each do-not-populate reference explicitly and keep the BOM, drawing and variant list consistent. Do not rely only on an informal note or a missing spreadsheet row to communicate a deliberate omission.
Link to this answer25. How should reference designators be grouped?
Group identical fitted parts only when the manufacturer part, variant and supply responsibility are the same. Check that the reference count equals the quantity per board and that no designator appears twice.
Link to this answer26. Can an electrically similar part be substituted?
Similarity alone is not approval. Review footprint, pinout, ratings, tolerances, timing and software effects as applicable. Record the exact alternative and approval before purchasing or fitting it.
Link to this answer27. Can I prohibit all substitutions?
State a no-substitution requirement on the affected lines. Availability or lifecycle changes may then require a schedule change or design decision. A quotation should flag unresolved sourcing rather than silently changing the part.
Link to this answer28. What is an approved manufacturer list?
An AML identifies acceptable manufacturers and orderable parts for a BOM item. Distinguish preferred parts from approved alternates and document any restrictions. An AVL normally addresses vendors or sources and serves a different purpose.
Link to this answer29. What if two BOM rows describe the same part differently?
Reconcile the orderable part number and package before release. A free-text description can be ambiguous. Resolve duplicate quantities and designators so procurement does not buy twice or place the wrong value.
Link to this answer30. What should a BOM change record contain?
Record the old and new part, affected references, reason, approval and effective revision or lot. Include the disposition of purchased stock and any test, firmware or documentation changes.
Link to this answerComponent purchasing & availability

31. What is full turnkey PCB assembly?
Full turnkey combines the agreed bare-board fabrication, component purchasing and assembly scope. The customer still supplies the design and approves engineering decisions. Testing, programming and other services must be included explicitly.
Link to this answer32. What is partial turnkey assembly?
The customer supplies specified materials and the assembler sources the rest. Identify responsibility for bare boards and each component line, including required quantities, arrival dates and shortage handling.
Link to this answer33. Are all components immediately available?
Availability must be checked for the exact orderable parts and quantities. Website estimates and previous purchases do not reserve inventory. Ask how sourcing changes affect quote validity and the production start date.
Link to this answer34. Can I require authorized sourcing channels?
State the required manufacturer or distributor restrictions and the evidence needed. Confirm feasibility and quotation impact before purchasing. This page does not promise that every BOM can be sourced through a particular channel.
Link to this answer35. What happens when a part is out of stock?
Options may include waiting, an approved alternative, a customer-supplied part or a revised build plan. Review electrical and mechanical consequences before approving a change; do not assume any substitute is equivalent.
Link to this answer36. What if a component is obsolete?
Ask for lifecycle verification and evaluate approved stock, a last-time purchase or a design change. Consider traceability and future service needs. Unverified marketplace stock should not be treated as equivalent to a controlled source.
Link to this answer37. Why might purchasing quantities exceed fitted quantities?
Pack sizes, minimum order quantities and preparation losses can exceed the fitted requirement. Ask for the purchase quantity and excess-material policy separately from the number of assembled boards.
Link to this answer38. Can unused components be kept for the next order?
Request written agreement on ownership, storage conditions, duration, tracking and charges. Future reuse depends on condition, lifecycle, revision compatibility and the next order's requirements; it should not be assumed.
Link to this answer39. Can a supplier approve alternatives without asking me?
Define the approval policy before procurement. Some projects permit only listed alternates; others require approval for every change. The policy should specify who can approve and how the decision reaches the build record.
Link to this answer40. Does buying components guarantee the assembly delivery date?
No. File release, bare-board readiness, all kit items, process preparation and test readiness also affect the start. Ask for a complete schedule with dependencies rather than a component delivery date alone.
Ask what starts the quoted clock and whether completion means assembly finished, ready to ship or delivered. Use the PCB assembly lead-time planning guide to identify the longest unresolved dependency. Faster fabrication alone will not remove a later component or test-fixture constraint.
Link to this answerDefine full or partial turnkey sourcing · Discuss your requirements
Customer-supplied boards & parts
41. How should I label customer-supplied parts?
Label each package with the project reference, manufacturer part number, quantity and matching BOM line. Identify split shipments and ownership. Keep lot information and manufacturer labels with the parts where available.
Link to this answer42. How many spare components should I provide?
Request the job-specific allowance for setup and handling losses. The quantity depends on package, feeding method and build size. Do not apply one fixed percentage to all components, especially expensive or unusual parts.
Link to this answer43. Can I send loose components?
Ask before shipment. Feeding, orientation, ESD protection and damage risk depend on the component and packaging. Repacking or manual handling may affect cost and schedule; mixed unlabeled bags should be avoided.
Link to this answer44. Are cut tape and partial reels acceptable?
Provide the package, quantity and available tape condition for review. Leader/trailer needs and feeder compatibility vary. Keep identification intact and confirm any preparation requirement before shipping.
Link to this answer45. How should moisture-sensitive components arrive?
Preserve the original dry-pack identification where available and report exposure history. Handling depends on package requirements and condition; an opened bag may require review before reflow, not an automatic fixed bake cycle.
Link to this answer46. Must every component be baked?
No. The need and permissible conditions depend on moisture sensitivity, exposure, packaging and manufacturer guidance. Baking can damage unsuitable carriers or parts, so treatment must be reviewed rather than applied indiscriminately.
Link to this answer47. Can I supply the bare PCBs?
Provide the fabrication specification, revision, quantity and relevant acceptance records. Confirm panel format, finish, storage history and any incoming inspection requirements. Supplying boards does not remove compatibility checks for assembly.
Link to this answer48. Can one component shipment cover several projects?
Identify allocations by project, BOM line and quantity. Agree shared-stock handling in advance so shortages and ownership remain clear. A combined box should not mean an unidentified common kit.
Link to this answer49. What if incoming parts are short or damaged?
Document the affected identity and quantity and resolve the replacement or partial-build plan. Confirm whether the production schedule changes. Do not authorize substitutions merely to conceal a kit shortage.
Link to this answer50. What happens to unused or rejected customer material?
Agree return, storage or disposal instructions and record quantities. Rejected material needs a documented disposition. Do not assume a universal automatic-return or storage policy without confirming the order terms.
Link to this answerCompare material responsibilities · Discuss your requirements
SMT, soldering & board preparation

51. What are the main PCB assembly steps?
The typical route includes file review, material preparation, paste printing, placement, soldering, inspection and agreed tests before release. Second-side, through-hole, cleaning and protective processes are added only when the design requires them.
Link to this answer52. Is assembly the same as PCB fabrication?
No. Fabrication creates the bare board and its interconnections. Assembly fits components and performs the agreed soldering, inspection and test operations. A quote should identify which of these services is included.
Link to this answer53. What does a solder stencil do?
A stencil controls where paste is deposited before surface-mount placement. Aperture geometry, thickness, alignment and process conditions affect the deposit. A suitable stencil is part of process preparation, not a guarantee against all solder defects.
Link to this answer54. Can an existing stencil be reused?
Review the PCB and paste-layer revisions, frame compatibility and stencil condition. Even a small layout change can invalidate reuse. Confirm ownership and storage terms before assuming it remains available.
Link to this answer55. What is solder-paste inspection?
SPI evaluates deposited paste before placement, typically considering deposit geometry and consistency. It does not inspect the final reflowed joint or prove the assembled circuit functions.
Link to this answer56. What does the pick-and-place machine need?
It needs validated component data, feeder identities, placement coordinates, rotation and board references. The assembly drawing and polarity information help resolve ambiguities that coordinates alone cannot answer.
Link to this answer57. What reflow temperature should my board use?
There is no universal temperature. Establish a measured profile using solder-paste requirements, component limits and assembly thermal behavior. Oven settings alone do not describe the temperatures experienced by all parts.
Link to this answer58. Why are fiducials and board support important?
They help alignment and stable processing. Required locations, clearances and tooling depend on the board and equipment route. Review them before fabrication rather than guessing a universal number or margin.
Link to this answer59. Should boards be supplied as individual units or panels?
Panelization can aid handling and efficiency, especially for small or irregular boards. Discuss rails, fiducials, separation method and component clearance before releasing fabrication data. The best arrangement is project-specific.
Link to this answer60. Does double-sided assembly mean a two-layer PCB?
No. Assembly sides describe where components are fitted; copper layers describe the bare-board construction. A multilayer board may have components on one or both surfaces.
Link to this answerBGA, PoP, through-hole & special assemblies

61. How is double-sided SMT assembled?
A qualified route processes one side and then the other. Review component retention, support, side order and cumulative thermal exposure. The second reflow pass cannot be planned independently of components already fitted.
Link to this answer62. How does BGA assembly differ from visible-lead assembly?
Connections underneath the package need careful land-pattern, paste, moisture and reflow planning. Inspection must address hidden joints; an external photograph cannot demonstrate all solder connections are acceptable.
Link to this answer63. Does X-ray inspection prove a BGA works electrically?
No. X-ray can reveal certain internal features and solder conditions, but it does not replace the agreed electrical or functional tests. Inspection coverage and acceptance criteria should be specified.
Link to this answer64. What is Package on Package assembly?
PoP stacks compatible packages with connections between them and to the PCB. Alignment, warpage, flux/paste application and thermal processing require package-specific review. It is not merely two-sided SMT.
Link to this answer65. Can QFN thermal pads be treated like ordinary signal pads?
Exposed pads can have thermal and electrical roles. Land pattern, paste design and via treatment need package-specific review. Excess or insufficient solder can create problems; follow the applicable component guidance.
Link to this answer66. Does every through-hole board use wave soldering?
No. Selective, wave, manual and qualified pin-in-paste routes address different designs. Component thermal limits, access and adjacent SMT joints influence the appropriate process.
Link to this answer67. What information is needed for press-fit connectors?
Provide the exact connector specification, board finished-hole requirements, thickness and insertion/support instructions. Press-fit compatibility cannot be established from a nominal drill diameter alone.
Link to this answer68. Can flexible or rigid-flex boards be assembled?
They need review of support, handling, thermal limits, stiffeners and component placement relative to flex regions. Send the construction and mechanical requirements; do not assume rigid-board tooling applies unchanged.
Link to this answer69. What should I specify for heavy or tall components?
Provide height, mass, mechanical support and orientation requirements. Shipping and operating loads may require retention measures. Any adhesive, fastener or soldering change should be defined and reviewed.
Link to this answer70. Is box build included with PCB assembly?
Not automatically. Enclosures, cables, connectors, mechanical integration and system-level tests require a separate scope. Supply mechanical drawings, wiring information and the required finished-product configuration.
Link to this answerReview BGA assembly requirements · Discuss your requirements
Prototype, first article & sample approval

71. What is the difference between a prototype and a first article?
A prototype explores or validates a design. A first article checks an initial build against agreed requirements before further production. The same physical board may serve both purposes only if the approval scope is defined.
Link to this answer72. Can production wait for my sample approval?
Request a documented hold point and identify the approver. Specify what may proceed before approval, how samples are evaluated and how the hold affects material commitments and delivery.
Link to this answer73. What should a first-article review include?
Define the required checks: identity, fitted BOM, orientation, workmanship, dimensions, programming and tests as applicable. Specify the report format and evidence needed so approval is based on agreed criteria.
Link to this answer74. Are photographs enough to approve a sample?
Photographs can help check visible placement and orientation. They do not establish hidden-joint quality, electrical operation or all dimensions. Request appropriate inspection and test evidence for the approval decision.
Link to this answer75. How many sample boards should be checked?
The quantity depends on the product, risk, process and acceptance plan. Agree it before production. This page does not prescribe a universal sample size or substitute for a validated sampling plan.
Link to this answer76. Can the sample use substitute components?
Only under the agreed approval policy. Record the substitutions and whether they also apply to production. A working sample with different parts does not automatically qualify the original or future BOM.
Link to this answer77. What if I discover a design error during bring-up?
Record the affected revision, symptoms and proposed correction. Separate design changes from workmanship issues. Review purchased materials and work in progress before releasing a revised build package.
Link to this answer78. Can a hand-modified sample become the production reference?
Document every modification in controlled drawings, BOM and instructions. A physical sample alone is ambiguous. Confirm whether the modifications are temporary engineering changes or part of the released design.
Link to this answer79. Who approves the production release after a pilot?
Name the authorized customer and manufacturing decision makers in the project plan. Record approval of open issues, deviations and the release baseline. Silence should not be treated as technical approval unless explicitly agreed.
Link to this answer80. What must change when moving from prototype to repeat production?
Stabilize revisions, sourcing rules, fixtures, programming and test limits. Confirm traceability and packaging. Prototype handling or temporary workarounds should not silently become an uncontrolled production process.
Link to this answerPrepare a prototype or pilot build · Discuss your requirements
Inspection, standards & functional testing

81. How do IPC-A-610 and J-STD-001 differ?
IPC-A-610 addresses assembly acceptability; J-STD-001 addresses soldered assembly requirements. Specify the applicable revision, class and contract requirements. Mentioning a standard does not prove a factory or an order is certified to it.
Link to this answer82. Which IPC class should I request?
Choose according to the product's requirements and governing specifications, then confirm feasibility and acceptance scope. Do not select a class solely as a marketing label; stricter requirements can affect design and process choices.
Link to this answer83. What can AOI detect?
AOI evaluates accessible visual features such as presence, orientation and visible joint conditions within its configured coverage. It cannot see every hidden connection or validate all electrical functions.
Link to this answer84. How is a suspected defect handled?
Confirm the finding against acceptance criteria, record the affected units and decide the disposition. Rework requires approved instructions and appropriate reinspection or retest; a repair should not disappear from required records.
Link to this answer85. What is the difference between ICT and functional testing?
ICT checks defined electrical characteristics and connections using available access. Functional testing exercises specified behavior under stated conditions. Their coverage overlaps only partly and depends on the actual test design.
Link to this answer86. Can flying-probe testing replace every other test?
No. Its usefulness depends on board access and the faults to be detected. It does not universally replace powered functional testing, firmware validation or inspection of all workmanship conditions.
Link to this answer87. What must I provide for functional testing?
Define connections, power conditions, stimuli, expected outputs, limits, sequence and result recording. Include firmware and fixture information where needed. A request to 'test everything' is not an executable test specification.
Link to this answer88. Are burn-in and environmental testing included?
Only when agreed. Define conditions, duration, monitoring, sample quantities and acceptance limits, and confirm available facilities. Ordinary functional testing should not be described as a reliability qualification.
Link to this answer89. Can I receive inspection and test reports?
Specify which records, identifiers and format you need during quotation. Confirm coverage, retention and delivery terms. Reports are not automatically included merely because equipment photos appear on the website.
Link to this answer90. Does a working board prove long-term reliability?
No. Passing defined tests demonstrates the tested conditions and coverage. Reliability may require product-specific qualification and field evidence; one functional pass cannot establish lifetime behavior.
Link to this answerReview quality and evidence requirements · Discuss your requirements
Programming, cleaning, coating & integration

91. What information is needed for device programming?
Provide a controlled firmware file, version, target devices, programming interface and verification instructions. Define configuration data and security settings separately. Avoid sending secret keys through ordinary public enquiry fields.
Link to this answer92. Can every board receive a unique serial number?
Specify the format, allocation source, location and link to test records. Confirm how duplicates and rejected units are handled. Serialization hardware and data integration must be agreed, not assumed.
Link to this answer93. Can I update firmware during an order?
Request a controlled change with an effective unit or lot boundary. Determine which completed boards need reprogramming and retest, and assess schedule impact before approving the update.
Link to this answer94. Does no-clean flux mean residues never need review?
No. Cleaning decisions depend on materials, electrical requirements, environment and later processes. Evaluate compatibility and cleanliness requirements rather than assuming the flux name alone settles the question.
Link to this answer95. Is every assembly suitable for washing?
No. Some components and materials have cleaning restrictions. Review the method, chemistry and drying requirements before assembly. Process order may need to account for non-washable items.
Link to this answer96. When is conformal coating appropriate?
It depends on the product environment and design requirements. Specify the material, coverage, masking, thickness or acceptance method as applicable. Coating does not correct existing solder defects or replace suitable enclosure design.
Link to this answer97. What should a coating masking drawing show?
Identify connectors, contacts, test points, adjustment features and other keep-out areas. Include borders and any special access requirements. An unmarked board photograph is not a precise masking specification.
Link to this answer98. Is potting the same as conformal coating?
No. Potting fills a volume around the assembly and can change thermal behavior, stress and repairability. Review material compatibility, cure conditions and mechanical constraints separately from a thin protective coating.
Link to this answer99. When should testing occur relative to coating?
Define the sequence for the product. Testing before coating can help avoid sealing in defects; checks after coating may also be required. Accessibility, cure and compatibility determine the released process.
Link to this answer100. Can cables and enclosures be added after assembly?
Request a box-build scope including drawings, cable identities, hardware, torque requirements and system tests. Confirm which party supplies each item and how mechanical changes are controlled.
Link to this answerDefine integration and test scope · Discuss your requirements
Packaging, shipment & receiving

101. How should completed PCBAs be packaged?
Packaging should protect against ESD and mechanical damage and support the product's handling needs. Specify separation, connector protection, labeling and any moisture requirements before shipment.
Link to this answer102. Does every assembly need vacuum packaging?
No. Moisture protection depends on the assembly and storage requirements. Vacuum alone is not proof of ESD or moisture protection; agree the appropriate materials and method for the product.
Link to this answer103. Can boards be packed individually?
State unit-pack, tray or bulk requirements, allowable contact points and labeling. Confirm cost and space implications. Individual packaging still needs suitable ESD and mechanical protection.
Link to this answer104. How can tall connectors and fragile parts be protected?
Identify protruding or load-sensitive features and acceptable support areas. Packaging should prevent board-to-board contact and damaging loads during handling. Consider the product geometry rather than only the board outline.
Link to this answer105. What labels should be on the shipment?
Agree product number, revision, quantity, lot/serial identity and handling information. Customer-specific barcodes or label formats need a controlled specification and verification step.
Link to this answer106. Can one order ship in several releases?
Request quantities and destinations for each release and clarify approval, inspection and freight scope. Split delivery may affect setup, inventory and paperwork; it should be reflected in the quotation.
Link to this answer107. Which documents should accompany a shipment?
Specify the packing list and any agreed conformity, inspection, test or traceability records. The documentation package depends on the order and should be reviewed before dispatch.
Link to this answer108. Who is responsible for freight, duties and import paperwork?
Confirm the delivery terms, destination and responsible parties in the commercial agreement. Ask for clarification before accepting a quote; this FAQ does not set tax, customs or carrier policy.
Link to this answer109. What should I check when receiving the boards?
Check shipment identity, count, packaging condition and required records, then perform your agreed receiving inspection. Preserve packaging and photographs if damage or a discrepancy is found.
Link to this answer110. What if a shipment arrives damaged or incomplete?
Record the condition, quantities and identifiers promptly and contact the project team with evidence. Follow the agreed carrier and order procedures. Do not discard affected packaging or modify boards before the issue is reviewed.
Link to this answerView assembly and packing equipment · Discuss your requirements
Repeat orders, changes & after-delivery support
111. Can I reorder using the previous purchase order number?
Use it as a reference, but confirm quantity, current revision, requested date and changes. Revalidate component availability and the test/firmware baseline rather than assuming the previous quote still applies.
Link to this answer112. What is an engineering change order?
An ECO controls a design or process change with identified revisions, affected items, approvals and an effective boundary. It should also address stock, work in progress, tests and documentation.
Link to this answer113. Can old and new revisions be shipped together?
Only with agreed identification and acceptance. Separate quantities and labels so receiving and downstream users can distinguish revisions. Avoid combining different configurations under a single ambiguous product label.
Link to this answer114. How should obsolete inventory be handled after a change?
Review the material against the new design and agree reuse, return, storage or disposal. Record ownership and costs. Do not fit superseded components solely to consume inventory without engineering approval.
Link to this answer115. Can fixtures be reused for repeat orders?
Check revision compatibility, condition, calibration where applicable and storage availability. Confirm ownership and maintenance responsibilities. A previous fixture does not automatically remain suitable after a design or test change.
Link to this answer116. What information helps investigate a failed board?
Provide product and serial/lot identity, failure symptoms, operating conditions, logs and photographs where useful. Distinguish intermittent and repeatable behavior. Avoid destructive changes that erase evidence before agreeing an investigation plan.
Link to this answer117. Can a failed board be reworked?
Possibility depends on the fault, board condition, component availability and rework limits. Request review and authorization with acceptance and retest criteria; repair should not be promised before assessment.
Link to this answer118. What warranty applies to an assembly order?
Use the terms agreed for that order, including scope, exclusions, claim process and time limits. This FAQ does not create a new warranty or copy another manufacturer's policy.
Link to this answer119. Can I request a supplier audit or certificates?
State the required scope and documents, and confirm what is available and current. Check certificate entity, address, scope and validity. A logo or photograph alone is insufficient evidence for a customer audit.
Link to this answer120. What is the fastest way to ask a question not covered here?
Send your project stage, board revision, quantity and the specific decision or issue through Contact. Attach relevant files using the agreed method. You can ask for guidance before every technical detail is finalized.
Link to this answerCheck the right reference for your build
For soldering and acceptance requirements, consult the applicable licensed standard and contract revision. IPC explains the roles of its assembly standards. For component-specific assembly and handling, consult TI SMT application notes and the actual component manufacturer documentation.
These references do not establish RAYPCB certification or approve a particular design. Requirements, exceptions and evidence must be agreed for the project.
Ready to resolve the remaining questions?
Send the board revision, quantity, project stage and the decision you need help with. For a quotation, include the BOM, board files, placement data and test requirements where available. You can start the discussion with preliminary information.
Contact RAYPCB about your buildSee the illustrated PCB assembly process · PCB Assembly services